Smappee EV Wall Business - 7.4-22kW

from $1,900.00
Cable:
Colour:
  • Charging Capacity: 7.4–22 kW (1 hour or charging delivers up to 40-120 km of range)

  • Outlet Port: Single

  • Input Supply: 22 kW Three-Phase (32A), 7.4 kW Single-Phase (32A)

  • Connector: Type 2

  • Cable: Tethered cable ( 8 meter)

  • Compatibility: All EVs

  • Usage Billing: Yes

  • Warranty: 2 years (can be extended to up to 5 years for a fee)

  • Charging Capacity: 7.4–22 kW (1 hour or charging delivers up to 40-120 km of range)

  • Outlet Port: Single

  • Input Supply: 22 kW Three-Phase (32A), 7.4 kW Single-Phase (32A)

  • Connector: Type 2

  • Cable: Tethered cable ( 8 meter)

  • Compatibility: All EVs

  • Usage Billing: Yes

  • Warranty: 2 years (can be extended to up to 5 years for a fee)

EV Charger standard Installation (Three phase) in NSW EV Charger standard Installation (Three phase) in NSW EV Charger standard Installation (Three phase) in NSW EV Charger standard Installation (Three phase) in NSW EV Charger standard Installation (Three phase) in NSW
Cable run:
EV Charger standard Installation (Single phase) in NSW EV Charger standard Installation (Single phase) in NSW EV Charger standard Installation (Single phase) in NSW EV Charger standard Installation (Single phase) in NSW EV Charger standard Installation (Single phase) in NSW
Cable run:

The Smappee EV Wall Business is a wall-mounted commercial EV charger designed for workplaces, strata car parks and light commercial sites where multiple users share a single charger and accurate cost recovery is required. It delivers 7.4kW on single-phase or up to 22kW on three-phase supply, with integrated LED lighting that clearly indicates charging status and improves visibility in parking areas. Drivers can start a session by plugging in, tapping an RFID card or scanning a QR code, and the unit is ACMA-certified and compliant with Australian standard AS/NZS 3820. When paired with the Smappee Infinity platform, it gains dynamic load balancing and solar surplus charging to maximise use of on-site renewable energy.